国家标准

GB51110-2015:洁净厂房施工及验收规范

GB51110-2015:洁净厂房施工及验收规范

更新时间:2023-04-26 10:16:45 立即下载

GB51110-2015:洁净厂房施工及验收规范

GB51110-2015······1

1总则······17

2术语、缩略语······18

2.1术语······18

2.2缩略语······19

3基本规定······20

4建筑装饰装修······21

4.1一般规定······21

4.2墙、柱、顶涂装工程······22

4.3地面涂装工程······24

4.4高架地板······26

4.5吊顶工程······27

4.6墙体工程······30

4.7门窗安装工程······32

5净化空调系统······35

5.1一般规定······35

5.2风管及部件······35

5.3风管系统安装······39

5.4净化空调设备安装······41

5.5系统调试······46

6排风及废气处理······49

6.1一般规定······49

6.2风管、附件······49

6.3排风系统安装······52

6.4废气处理设备安装······55

6.5系统调试······57

7配管工程······60

7.1一般规定······60

7.2碳素钢管安装······61

7.3不锈钢管道安装······63

7.4BA/EP不锈钢管道安装······65

7.5PP/PE管道安装······66

7.6PVDF管道安装······69

7.7PVC管道安装······71

7.8配管检验和试验······73

8消防、安全设备安装······75

8.1一般规定······75

8.2管线安装······75

8.3消防、安全设备安装······76

9电气设施安装······79

9.1一般规定······79

9.2电气线路安装······79

9.3电气设备安装······80

9.4防雷及接地设施安装······82

10微振控制设施施工······84

10.1一般规定······84

10.2微振控制设施施工······84

11噪声控制设施安装······86

11.1一般规定······86

11.2噪声控制设施安装······86

12特种设施安装······88

12.1一般规定······88

12.2高纯气体、特种气体供应设施安装······88

12.3纯水供应设施安装······91

12.4化学品供应设施安装······93

13生产设备安装······96

13.1一般规定······96

13.2设备安装······96

13.3二次配管配线······98

14验收······100

14.1一般规定······100

14.2洁净厂房的测试······100

14.3竣工验收······104

14.4性能验收······105

14.5使用验收······106

附录A洁净厂房主要施工程序······108

附录B测试项目的选择和实施顺序······110

附录C测试方法······114

附录D工程质量验收记录用表······126

本规范用词说明······134

引用标准名录······135

附:条文说明······137

GB51110-2015······1

1总则······145

3基本规定······146

4建筑装饰装修······147

4.1一般规定······147

4.2墙、柱、顶涂装工程······148

4.3地面涂装工程······149

4.4高架地板······149

4.5吊顶工程······150

4.6墙体工程······152

4.7门窗安装工程······153

5净化空调系统······155

5.1一般规定······155

5.2风管及部件······155

5.3风管系统安装······158

5.4净化空调设备安装······160

5.5系统调试······163

6排风及废气处理······166

6.1一般规定······166

6.2风管、附件······166

6.3排风系统安装······168

6.4废气处理设备安装······169

6.5系统调试······171

7配管工程······173

7.1一般规定······173

7.2碳素钢管安装······174

7.3不锈钢管道安装······175

7.4BA/EP不锈钢管道安装······176

7.5PP/PE管道安装······177

7.6PVDF管道安装······179

7.7PVC管道安装······180

7.8配管检验和试验······181

8消防、安全设备安装······183

8.1一般规定······183

8.2管线安装······183

8.3消防、安全设备安装······184

9电气设施安装······186

9.1一般规定······186

9.2电气线路安装······186

9.3电气设备安装······187

9.4防雷及接地设施安装······187

10微振控制设施施工······189

10.1一般规定······189

10.2微振控制设施施工······189

11噪声控制设施安装······190

11.1一般规定······190

11.2噪声控制设施安装······190

12特种设施安装······192

12.1一般规定······192

12.2高纯气体、特种气体供应设施安装······192

12.3纯水供应设施安装······193

12.4化学品供应设施安装······194

13生产设备安装······196

13.1一般规定······196

13.2设备安装······196

13.3二次配管配线······197

14验收······198

14.1一般规定······198

14.2洁净厂房的测试······199

14.3竣工验收······200

14.4性能验收······201

14.5使用验收······202

附录B测试项目的选择和实施顺序······203