GB51104-2015:取向硅钢生产线设备安装与验收规范

GB51104-2015:取向硅钢生产线设备安装与验收规范

更新时间:2023-06-20 17:10:58 立即下载

GB51104-2015:取向硅钢生产线设备安装与验收规范

本规范共分11章和5个附录,主要技术内容包括:总则,基本规定,设备基础、地脚螺栓和垫板,设备及材料进场,剪切设备,带钢连接设备,带钢表面处理设备,卧式连续退火炉,烘烤炉,环形退火炉,安全及环保等。

GB51104-2015······1

1总则······15

2基本规定······16

3设备基础、地脚螺栓和垫板······19

3.1设备基础施工······19

3.2设备基础验收······19

3.3地脚螺栓安装······20

3.4地脚螺栓验收······21

3.5垫板安装······21

3.6垫板验收······22

4设备及材料进场······23

4.1一般规定······23

4.2设备及材料验收······23

5剪切设备······25

5.1月牙剪安装······25

5.2月牙剪验收······25

5.3圆盘剪安装······25

5.4圆盘剪验收······26

5.5横切剪安装······26

5.6横切剪验收······27

5.7剪切设备试运转······27

6带钢连接设备······29

6.1缝合机安装······29

6.2缝合机验收······29

6.3激光焊机安装······29

6.4激光焊机验收······30

6.5窄搭焊接机安装······30

6.6窄搭焊接机验收······30

6.7带钢连接设备试运转······31

7带钢表面处理设备······32

7.1抛丸机安装······32

7.2抛丸机验收······32

7.3碾压辊安装······32

7.4碾压辊验收······32

7.5带钢干燥器安装······33

7.6带钢干燥器验收······33

7.7涂油机安装······34

7.8涂油机验收······34

7.9涂层机安装······34

7.10涂层机验收······35

7.11带钢表面处理设备试运转······36

8卧式连续退火炉······37

8.1炉体钢平台安装······37

8.2炉体钢平台验收······37

8.3炉室安装······38

8.4炉室验收······39

8.5炉内设备安装······40

8.6炉内设备验收······41

8.7炉体气密性试验······41

8.8卧式连续退火炉试运转······42

9烘烤炉······43

9.1炉体钢平台安装······43

9.2炉体钢平台验收······43

9.3炉室安装······44

9.4炉室验收······45

9.5炉内设备安装······45

9.6炉内设备验收······45

9.7烘烤炉试运转······46

10环形退火炉······47

10.1支撑辊、导向辊安装······47

10.2支撑辊、导向辊验收······47

10.3炉体钢结构安装······48

10.4炉体钢结构验收······48

10.5下部台车安装······49

10.6下部台车验收······49

10.7旋转钢平台安装······50

10.8旋转钢平台验收······50

10.9炉壳安装······51

10.10炉壳验收······51

10.11上部台车安装······51

10.12炉门安装······52

10.13炉门验收······52

10.14环形退火炉试运转······52

11安全及环保······54

11.1安全······54

11.2环保······55

附录A取向硅钢生产线设备安装分部分项工程划分表······56

附录B取向硅钢生产线设备安装分项工程质量验收记录······58

附录C取向硅钢生产线设备安装分部工程质量验收记录······59

附录D取向硅钢生产线设备安装单位工程质量验收记录······60

附录E取向硅钢生产线设备无负荷试运转记录······63

本规范用词说明······64

引用标准名录······65

附:条纹说明······67

1总则······70

2基本规定······71

3设备基础、地脚螺栓和垫板······74

3.1设备基础施工······74

3.2设备基础验收······74

3.3地脚螺栓安装······74

3.4地脚螺栓验收······74

3.5垫板安装······75

3.6垫板验收······75

4设备及材料进场······76

4.1一般规定······76

4.2设备及材料验收······76

6带钢连接设备······77

6.3激光焊机安装······77

6.5窄搭焊接机安装······77

7带钢表面处理设备······78

7.9涂层机安装······79

8卧式连续退火炉······79

8.3炉室安装······79

8.7炉体气密性试验······79

10环形退火炉······80

10.1支撑辊、导向辊安装······80

10.3炉体钢结构安装······80

10.9炉壳安装······81

10.11上部台车安装······83

11安全及环保······84

11.1安全······84